Austin businesses move often. Companies outgrow a first office, relocate closer to where staff live, open a second location in Round Rock or Kyle, or move into one of the new buildings going up across the region. The IT side of a move is easy to underestimate, and it is the part that decides whether staff can work on the first morning. Use this checklist as a starting point and adjust the timing to your move.
As soon as the lease is signed
Order internet early
Circuits in new buildings can take a while to install. Internet is the item with the longest and least predictable lead time, especially in new construction or business parks where a provider has to extend its lines.
- Ask the landlord which providers already serve the building and where their equipment enters.
- Order the main connection right away, and consider a second connection from a different provider for failover.
- Confirm the speeds you need, particularly upload speed for video calls, cloud backups and VoIP phones.
- Get the install date in writing, and follow up regularly.
Walk the space
- Find the room or closet that will hold the network equipment. It needs power, ventilation and a lock.
- Note where people will sit, where printers will go and where conference rooms will be.
- Check the walls and ceilings. Glass, concrete and metal all affect Wi-Fi.
Review the current setup
- List every device that will move: workstations, laptops, printers, phones, servers, network equipment.
- Decide what is too old to move. A move is a good time to retire unsupported hardware.
- Check software licenses tied to a location or a specific machine.
Before the build-out
Cabling and Wi-Fi
Plan drops and access point placement before furniture. Once walls are closed and desks are installed, changes cost far more.
- Mark a network drop for every desk, printer, TV, phone and camera, plus spares.
- Plan access point locations for coverage, not convenience, and run cable to each one.
- Label every cable at both ends, matched to a floor plan.
- Have the cabling tested and documented by the installer.
Security and access
- Plan door access, cameras and alarm systems if they depend on the network.
- Design separate networks for staff, guests and devices such as cameras and printers.
- Decide how visitors will get Wi-Fi without reaching business systems.
Four to six weeks before the move
Phones
Port numbers and test call flows. Phone numbers can usually come with you, but porting takes time and needs exact account details from your current provider.
- Confirm whether you are keeping your phone system or changing it.
- Start number porting early and schedule the cutover date.
- Review call flows, auto attendant messages and hunt groups for the new layout.
- Test calls in and out, including transfers and voicemail, before moving day.
Network equipment
- Configure the firewall, switches and access points ahead of time, ready to install.
- Set up internet failover if you ordered a second connection.
- Plan how remote access and any site-to-site connections will change.
Communicate
- Tell staff what to pack, what IT will move and when systems will be down.
- Update your address with software vendors, insurers and anyone who ships to you.
- Update your Google Business Profile and website once the move date is confirmed.
The week before
- Confirm the internet is installed and tested at the new office.
- Install and test network equipment in the new space.
- Make sure backups are current and test a restore before anything is unplugged.
- Label every device with its owner and destination desk.
- Photograph cable connections on servers and network equipment before disconnecting.
Moving day
Label, move, test, then let staff in.
- Shut down servers and network equipment cleanly.
- Move servers and network gear first, then workstations, printers and phones.
- Bring up the network, then servers, then workstations.
- Test internet, email, file access, printing, phones and line-of-business software at a sample of desks.
- Walk the office and check every workstation before staff arrive.
Moves often happen at the end of the week so there is time to fix surprises before a full workday.
The first week after
- Be on hand, in person or remotely, for the first morning as staff log in.
- Fix any desk or printer that was missed.
- Confirm backups and monitoring are running from the new location.
- Update network documentation and floor plans with what was actually installed.
- Securely wipe or recycle any equipment that did not make the move.
Opening a second location
Opening an additional office follows the same steps, plus a few more: connecting the two sites securely, deciding where shared files live, extending the phone system so extensions can dial each other, and keeping security and support standards the same in both places.
How we help
For managed IT clients, office moves and new locations are planned and quoted as projects, then supported under managed IT once you are settled. Remote work covers much of the planning and configuration, and if on-site help is needed, we send someone to your office or coordinate locally. Security for the new space, from separate guest networks to MFA, is covered on our cybersecurity page.